Reno Tahoe International Airport Consolidated Security Screening Checkpoint (CSCF)
The project scope includes the remodel of 44,800 sq ft of existing building and the addition of 22,000 sq ft of new construction. This project involved extensive electrical knowledge as it addressed exterior electrical design elements, interior electrical design elements covering all systems (Electrical / Fire Alarm / Public Address), lighting design and controls, power design, usage and demand recordings. The checkpoint portion was designed to include all electrical TSA design requirements. Construction costs are $38 million.
Photography By Vance Fox