RTIA Temporary Check-In and Baggage Facility

Reno-Tahoe International Airport Temporary Check-In and Baggage Facility

A 56,500 sq ft temporary facility was created to house check-in, all airline offices, TSA bag screening and bag handling area while the permanent facility was remodeled. PK Electrical, Inc. was responsible for the design of temporary facility services including a lighting evaluation, interior and exterior lighting and controls design, emergency back-up power, medium voltage power distribution, security system, public address and fire alarm systems. Special equipment included over 1200 ft of bag conveying system and in-line bag screening equipment. Construction costs were $4.1 million.