North Las Vegas Readiness Center

North Las Vegas Readiness Center; Las Vegas, Nevada

PK Electrical provided electrical engineering drawings and specifications for a new Readiness Center. The multiple task project included a 68,593 sq ft readiness center building, a 25,000 sq ft unheated enclosure/shed vehicle storage building, a 10,000 sq ft unheated storage building, a 300 sq ft stand-alone controlled waste facility, a new entrance to the Floyd Desalt Training Center, an 800 sq ft entrance guard house as well as the realignment of Range Road which included required street lighting and electrical utilities. The project was LEED Silver certified. The project was completed in REVIT and delivered using CMAR. Construction cost was $32 million.