Building 6 Fuel Tank Replacement, VA Hospital Reno, Nevada

Building 6 Fuel Tank Replacement, VA Hospital Reno, Nevada

PK Electrical, Inc. provided complete design for a new underground 15,000 gallon diesel fuel tank at the Reno VA Medical Center. The design included new control and power requirements for all relocated and new mechanical pumps as well as pump motors, disconnects, and monitoring equip. PK Electrical, Inc. was the prime engineering team consultant for this project.