Army National Guard Armory Renovations

Nevada Army National Guard Rural Armory Renovations Ely, Elko, Fallon, Yerington and Winnemucca, Nevada

All locations were very similar in scope and construction costs. The former electrical system for each building was grossly undersized for the current needs of the facility. Along with the new electrical system, a new HVAC system and data/ telephone/ intercom systems were designed and installed throughout the entire armory. A new general lighting system was designed and installed throughout the armory; all new exit and egress lighting was designed and installed throughout the entire building. Finally, the entire kitchen area was completely redesigned with new equipment. Construction cost was $10 million.